MODELIX-829 Split INode interface into multiple interfaces #3325
Triggered via pull request
February 3, 2025 12:08
Status
Failure
Total duration
1h 5m 11s
Artifacts
–
Annotations
6 errors
build-mps-components (2021.2)
The job running on runner GitHub Actions 8 has exceeded the maximum execution time of 60 minutes.
|
build-mps-components (2021.2)
The operation was canceled.
|
build-mps-components (2021.3)
The job was canceled because "_2021_2" failed.
|
build-mps-components (2021.3)
The operation was canceled.
|
build-mps-components (2022.2)
The job was canceled because "_2021_2" failed.
|
build-mps-components (2022.2)
The operation was canceled.
|