Skip to content

product_demo_checklist

cTurtle98 edited this page Jun 19, 2022 · 3 revisions

ROV COMPETITION PRODUCT DEMONSTRATION SETUP CHECKLIST

this is the procedure checklist for doing an rov demo

parts list

  • rov
  • tether
  • overhead projector cart
  • carabeaner
  • 6 in diameter webbing loop
  • webbing ladder
  • ethernet router
    • router power supply
  • controller laptop
    • laptop power supply
  • 2x 10ft ethernet cables.
  • xbox 360 controller

setup procedure

  • assemble overhead projector cart
    • short shelf on the bottem
    • tall shelf on the top
  • unspool teather and coil onto bottem shelf of cart.
  • place the rov on middle tall shelf
  • attach the rov side of tether to rov
  • use the carabeaner to attach the tether shore side strain releif to cart handle
  • router on top of cart
    • router psu plugged into cart powerstrip
    • router psu plugged into router
    • topside tether ethernet plugged into router
    • controller laptop ethernet plugged into router
  • contller laptop on top of cart
    • controller laptop psu plugged into cart powerstrip
    • controller laptop psu pluged into laptop
    • xbox360 controller plugged into laptop
    • controller laptop ethernet plugged into controller laptop
    • cables managed so laptop can be pulled down to controller table

demo procedure

  • use the webbing ladder to strap the cart to the side of the table
  • unload the rov from the cart and place it on the pool deck
  • unload the tether from the cart and place on the pool deck
  • uncoil the cart extension cord and plug in the cart
  • make sure the router switch is flipped to on
  • bring the laptop with the xbox360 controller down to the table
  • open the laptop and login
    • user: ubuntu
    • password: Cabri11o
  • plug in the rov and wait for the speed controler initialization sound.
  • on the laptop and open the terminal application and run the command source ~/cabrillo_rov/misc/shore_startup.sh