Skip to content

Sync integration pt2 #5424

Sync integration pt2

Sync integration pt2 #5424

Triggered via pull request February 2, 2025 09:11
Status Failure
Total duration 10m 43s
Artifacts 1

ci.yaml

on: pull_request
cargo-checkmate  /  Cache checkmate
2s
cargo-checkmate / Cache checkmate
test  /  Build test artifacts
8m 14s
test / Build test artifacts
Reject trailing whitespace
4s
Reject trailing whitespace
Run doc tests
2m 12s
Run doc tests
Matrix: cargo-checkmate / Cargo checkmate
Matrix: test / Run tests
Fit to window
Zoom out
Zoom in

Annotations

15 errors
test / Run tests (8)
Process completed with exit code 100.
test / Run tests (7)
The job was canceled because "_8" failed.
test / Run tests (7)
Process completed with exit code 100.
test / Run tests (5)
The job was canceled because "_8" failed.
test / Run tests (5)
The operation was canceled.
test / Run tests (6)
The job was canceled because "_8" failed.
test / Run tests (6)
The operation was canceled.
test / Run tests (2)
The job was canceled because "_8" failed.
test / Run tests (2)
The operation was canceled.
test / Run tests (1)
The job was canceled because "_8" failed.
test / Run tests (1)
The operation was canceled.
test / Run tests (3)
The job was canceled because "_8" failed.
test / Run tests (3)
The operation was canceled.
test / Run tests (4)
The job was canceled because "_8" failed.
test / Run tests (4)
The operation was canceled.

Artifacts

Produced during runtime
Name Size
nextest-archive
565 MB