Skip to content

Run push CI on N150 or N300 #140

Run push CI on N150 or N300

Run push CI on N150 or N300 #140

Triggered via push January 28, 2025 09:22
Status Failure
Total duration 3h 5m 33s
Artifacts 2

on-push.yml

on: push
pre-commit  /  pre-commit
13s
pre-commit / pre-commit
spdx  /  check-spdx-headers
6s
spdx / check-spdx-headers
Matrix: build / build
Matrix: test / tests
Fit to window
Zoom out
Zoom in

Annotations

2 errors and 3 warnings
test / tests (wormhole_b0, run)
The job running on runner torch-n300-1 has exceeded the maximum execution time of 120 minutes.
test / tests (wormhole_b0, run)
The operation was canceled.
spdx / check-spdx-headers
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
pre-commit / pre-commit
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
pre-commit / pre-commit
The `python-version` input is not set. The version of Python currently in `PATH` will be used.

Artifacts

Produced during runtime
Name Size
install-artifacts
1010 MB
test-reports-torch-wormhole_b0-run
2.99 KB