Skip to content

Addition of tests and code refactor #27

Addition of tests and code refactor

Addition of tests and code refactor #27

Triggered via pull request October 2, 2024 08:31
Status Failure
Total duration 33s
Artifacts

cloud_chatops.yaml

on: pull_request
Matrix: test_and_lint
push_dev_image_harbor
0s
push_dev_image_harbor
push_prod_image_harbor
0s
push_prod_image_harbor
Fit to window
Zoom out
Zoom in

Annotations

6 errors
test_and_lint (ubuntu-22.04, 3.12)
Process completed with exit code 8.
test_and_lint (ubuntu-20.04, 3.x)
Process completed with exit code 8.
test_and_lint (ubuntu-20.04, 3.12)
The job was canceled because "ubuntu-22_04_3_12" failed.
test_and_lint (ubuntu-20.04, 3.12)
The operation was canceled.
test_and_lint (ubuntu-22.04, 3.x)
The job was canceled because "ubuntu-22_04_3_12" failed.
test_and_lint (ubuntu-22.04, 3.x)
The operation was canceled.