Skip to content

build(deps-dev): bump @vitest/coverage-v8 from 2.1.8 to 3.0.2 #233

build(deps-dev): bump @vitest/coverage-v8 from 2.1.8 to 3.0.2

build(deps-dev): bump @vitest/coverage-v8 from 2.1.8 to 3.0.2 #233

Triggered via pull request January 21, 2025 06:10
Status Failure
Total duration 17s
Artifacts

build.yml

on: pull_request
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors and 1 warning
build (18)
Process completed with exit code 1.
build (22)
The job was canceled because "_18" failed.
build (22)
Process completed with exit code 1.
build (20)
The job was canceled because "_18" failed.
build (20)
The operation was canceled.
build (18)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636