Transfer - Fix files count and size after stop #1823
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
transferTests.yml
on: pull_request_target
artifactory-6
2m 38s
Matrix: Transfer-Artifactory-7-Tests
Annotations
9 errors
Transfer tests (windows)
Canceling since a higher priority waiting request for 'Transfer Tests-2290-refs/heads/dev' exists
|
Transfer tests (windows)
The operation was canceled.
|
Transfer tests (ubuntu)
Canceling since a higher priority waiting request for 'Transfer Tests-2290-refs/heads/dev' exists
|
Transfer tests (ubuntu)
The operation was canceled.
|
artifactory-6
Canceling since a higher priority waiting request for 'Transfer Tests-2290-refs/heads/dev' exists
|
artifactory-6
unknown field InstallCommandArgs in struct literal of type "github.com/jfrog/build-info-go/build/utils".NpmTreeDepListParam
|
artifactory-6
The operation was canceled.
|
Transfer tests (macos)
Canceling since a higher priority waiting request for 'Transfer Tests-2290-refs/heads/dev' exists
|
Transfer tests (macos)
The operation was canceled.
|