Skip to content

chore: Adapt husky precommit to latest version #1045

chore: Adapt husky precommit to latest version

chore: Adapt husky precommit to latest version #1045

Triggered via push December 6, 2024 09:36
Status Failure
Total duration 21s
Artifacts

build.yml

on: push
Matrix: test
quality
0s
quality
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 2 warnings
test (20.13.1)
Unable to locate executable file: pnpm. Please verify either the file path exists or the file can be found within a directory specified by the PATH environment variable. Also check the file mode to verify the file is executable.
test (18.20.2)
Unable to locate executable file: pnpm. Please verify either the file path exists or the file can be found within a directory specified by the PATH environment variable. Also check the file mode to verify the file is executable.
test (22.2.0)
The job was canceled because "_20_13_1" failed.
test (22.2.0)
The operation was canceled.
test (20.13.1)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
test (18.20.2)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636