Skip to content

Merge pull request #6246 from ecamp/renovate/eslint-plugin-cypress-4.x #2641

Merge pull request #6246 from ecamp/renovate/eslint-plugin-cypress-4.x

Merge pull request #6246 from ecamp/renovate/eslint-plugin-cypress-4.x #2641

Triggered via push October 30, 2024 16:57
Status Failure
Total duration 6m 28s
Artifacts 4
Continuous integration  /  api-check-needed
5s
Continuous integration / api-check-needed
Continuous integration  /  Tests: Frontend
2m 11s
Continuous integration / Tests: Frontend
Continuous integration  /  Tests: Print
1m 16s
Continuous integration / Tests: Print
Continuous integration  /  Tests: PDF
28s
Continuous integration / Tests: PDF
Continuous integration  /  e2e-check-needed
8s
Continuous integration / e2e-check-needed
Continuous integration  /  Lint: Frontend (ESLint)
35s
Continuous integration / Lint: Frontend (ESLint)
Continuous integration  /  Lint: ClientPrint (ESLint)
27s
Continuous integration / Lint: ClientPrint (ESLint)
Continuous integration  /  Lint: Print (ESLint)
33s
Continuous integration / Lint: Print (ESLint)
Continuous integration  /  Tests: API
0s
Continuous integration / Tests: API
Continuous integration  /  Lint: API (php-cs-fixer)
0s
Continuous integration / Lint: API (php-cs-fixer)
Continuous integration  /  ...  /  Tests: End-to-end (build job)
46s
Continuous integration / Tests: End-to-end build / Tests: End-to-end (build job)
Continuous integration  /  Lint: e2e (ESLint)
28s
Continuous integration / Lint: e2e (ESLint)
Continuous integration  /  Finish coveralls report
0s
Continuous integration / Finish coveralls report
Matrix: Continuous integration / Tests: End-to-end run / Tests: End-to-end
Continuous integration  /  workflow-success
3s
Continuous integration / workflow-success
Continuous integration  /  Send out CI success event
0s
Continuous integration / Send out CI success event
Build and push docker images  /  Build images and push
Build and push docker images / Build images and push
Upgrade or install deployment  /  Deploy to Kubernetes
Upgrade or install deployment / Deploy to Kubernetes
Fit to window
Zoom out
Zoom in

Annotations

4 errors and 11 warnings
Continuous integration / Tests: Frontend
Process completed with exit code 1.
Continuous integration / Tests: End-to-end run / Tests: End-to-end (edge)
Process completed with exit code 18.
Continuous integration / workflow-success
Job frontend-tests failed with status failure
Continuous integration / workflow-success
Job e2e-tests-run failed with status failure
Continuous integration / Tests: End-to-end run / Tests: End-to-end (edge)
No files were found with the provided path: e2e/data/**/*. No artifacts will be uploaded.

Artifacts

Produced during runtime
Name Size
cypress-output-chromefalse Expired
441 KB
cypress-output-firefoxfalse Expired
441 KB
e2e-tests-images Expired
225 MB
ecamp~ecamp3~9BXMFX.dockerbuild Expired
61.7 KB