Skip to content

fix: add optimism rpc #31

fix: add optimism rpc

fix: add optimism rpc #31

Triggered via push December 26, 2023 23:44
Status Cancelled
Total duration 1m 50s
Artifacts

test.yml

on: push
Run Unit and E2E Tests
1m 32s
Run Unit and E2E Tests
Run Optimized Unit Tests
1m 39s
Run Optimized Unit Tests
Fit to window
Zoom out
Zoom in

Annotations

4 errors
Run Unit and E2E Tests
Canceling since a higher priority waiting request for 'Tests-refs/heads/test/add-integration-tests' exists
Run Unit and E2E Tests
The operation was canceled.
Run Optimized Unit Tests
Canceling since a higher priority waiting request for 'Tests-refs/heads/test/add-integration-tests' exists
Run Optimized Unit Tests
The operation was canceled.