Skip to content

Bump shim crate version to 0.8 #2597

Bump shim crate version to 0.8

Bump shim crate version to 0.8 #2597

Triggered via push January 28, 2025 19:59
Status Failure
Total duration 2m 31s
Artifacts

ci.yml

on: push
Matrix: Checks
Matrix: Linux Integration
Matrix: Tests
Matrix: Windows Integration
Report required job statuses
0s
Report required job statuses
Fit to window
Zoom out
Zoom in

Annotations

23 errors
Linux Integration (ubuntu-20.04, v2.0.1)
Process completed with exit code 101.
Linux Integration (ubuntu-20.04, v1.7.24)
The job was canceled because "ubuntu-20_04_v2_0_1" failed.
Linux Integration (ubuntu-20.04, v1.7.24)
Process completed with exit code 101.
Linux Integration (ubuntu-20.04, v1.6.36)
The job was canceled because "ubuntu-20_04_v2_0_1" failed.
Linux Integration (ubuntu-20.04, v1.6.36)
The operation was canceled.
Linux Integration (ubuntu-22.04, v1.6.36)
The job was canceled because "ubuntu-20_04_v2_0_1" failed.
Linux Integration (ubuntu-22.04, v1.6.36)
The operation was canceled.
Linux Integration (ubuntu-22.04, v2.0.1)
The job was canceled because "ubuntu-20_04_v2_0_1" failed.
Linux Integration (ubuntu-22.04, v2.0.1)
The operation was canceled.
Linux Integration (ubuntu-22.04, v1.7.24)
The job was canceled because "ubuntu-20_04_v2_0_1" failed.
Linux Integration (ubuntu-22.04, v1.7.24)
The operation was canceled.
Tests (ubuntu-latest)
Process completed with exit code 101.
Checks (macos-latest)
Process completed with exit code 101.
Tests (macos-latest)
The job was canceled because "ubuntu-latest" failed.
Tests (macos-latest)
Process completed with exit code 101.
Checks (ubuntu-latest)
The job was canceled because "macos-latest" failed.
Checks (ubuntu-latest)
The operation was canceled.
Tests (windows-latest)
The job was canceled because "ubuntu-latest" failed.
Tests (windows-latest)
The operation was canceled.
Windows Integration (windows-latest, 1.7.0)
Process completed with exit code 1.
Windows Checks
Process completed with exit code 1.
Timings
Process completed with exit code 101.
Report required job statuses
Process completed with exit code 1.