Skip to content

Bump build.buf:buf from 1.49.0 to 1.50.0 (#270) #371

Bump build.buf:buf from 1.49.0 to 1.50.0 (#270)

Bump build.buf:buf from 1.49.0 to 1.50.0 (#270) #371

Triggered via push January 24, 2025 03:29
Status Failure
Total duration 5m 56s
Artifacts

ci.yaml

on: push
Matrix: build
Fit to window
Zoom out
Zoom in

Annotations

5 errors, 7 warnings, and 2 notices
build (ubuntu-latest)
Process completed with exit code 1.
build (macos-latest)
The job was canceled because "ubuntu-latest" failed.
build (macos-latest)
The operation was canceled.
build (windows-latest)
The job was canceled because "ubuntu-latest" failed.
build (windows-latest)
The operation was canceled.
build (ubuntu-latest)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
build (windows-latest)
Failed to delete D:\a\.gradle\wrapper\dists\gradle-8.8-bin\dl7vupf4psengwqhwktix4v1, which will impact caching. It is likely locked by another process. Output of 'jps -ml': 4372 org.gradle.launcher.daemon.bootstrap.GradleDaemon 8.8 8104 jdk.jcmd/sun.tools.jps.Jps -lm
build (windows-latest)
Unhandled error in Gradle post-action - job will continue: Error: EBUSY: resource busy or locked, unlink 'D:\a\.gradle\wrapper\dists\gradle-8.8-bin\dl7vupf4psengwqhwktix4v1\gradle-8.8\lib\agents\gradle-instrumentation-agent-8.8.jar'
221 tests found
There are 221 tests, see "Raw output" for the full list of tests.
221 tests found
There are 221 tests, see "Raw output" for the full list of tests.