Skip to content

Finalize dry option and refactoring #160

Finalize dry option and refactoring

Finalize dry option and refactoring #160

Triggered via push April 3, 2024 15:50
Status Failure
Total duration 1m 10s
Artifacts

linting.yml

on: push
Matrix: PHP-CS-Fixer
Matrix: PHPStan
Matrix: Psalm
Fit to window
Zoom out
Zoom in

Annotations

7 errors
Psalm (8.3, lowest)
Process completed with exit code 1.
Psalm (8.3, stable)
The job was canceled because "_8_3_lowest" failed.
Psalm (8.3, stable)
The operation was canceled.
Psalm (8.2, lowest)
The job was canceled because "_8_3_lowest" failed.
Psalm (8.2, lowest)
The operation was canceled.
Psalm (8.2, stable)
The job was canceled because "_8_3_lowest" failed.
Psalm (8.2, stable)
The operation was canceled.