feat(dev): add release and versioning guidelines
Browse files Browse the repository at this point in the history
Signed-off-by: Jose Martins <[email protected]>
  • Loading branch information
josecm committed Oct 27, 2023
1 parent cc58aae commit 4d0791b
Showing 1 changed file with 74 additions and 2 deletions.
76 changes: 74 additions & 2 deletions source/development/versioning.rst
Original file line number Diff line number Diff line change
@@ -1,4 +1,76 @@
.. _versioning:

Versioning
==========
Relases and Versioning
======================

Bao Project's repos follow a `semantic versioning scheme <https://semver.org/>`_
where, for each release, the specific `git commit is tagged
<https://git-scm.com/book/en/v2/Git-Basics-Tagging>` with a label with the form
MAJOR.MINOR.PATCH, where each version component is incremented as following:

* MAJOR version when you make incompatible API changes
* MINOR version when you add functionality in a backward compatible manner
* PATCH version when you make backward compatible bug fixes

When incrementing a given version the lower order components must be set to 0.

To illustrate, a project in its `2.3.1` might:

* bump to `2.3.2` if a given bug is patched;
* go to `2.4.0` when adding new eatures that don't break interface compatibility;
* tag `3.0.0` when adding new features that break interface compatibility;

Release Cycle
---------------

Bao's Project releases follow a loosely time-based cycle. The expected release
cadence, specifically, bumping the MINOR or MAJOR versions, is expected to be
every 4 to 8 months, depending on the number of contributions on that given
period. That is, if the number of contributions does not justify a release bump,
the release can be postponed to a maximum of 8 months.

Each release cycle is essentially composed by two stages:

* development, where the normal development process goes on, PRs with either new
features, fixes or other are submitted, reviewed and merged asynchronously,
following the `contibution guidelines`.

* during stabilization, the contributions made during the development stage
should be thorougly tested with the most comprehensive test batteries
available. Further, integration tests may be added at this point. Besides new
tests, maintainers must stop accepting PRs that are not bug fixes or
documentation. This stage is expected to last between 2 to 8 weeks, so
maintainers should be aware to stop the development stage after a maximum of
about 6 months depending on the ammount of new contributions: more
contributions will require a longer pre-release stage.

At the end of the release cycle the version is tagged and the process starts all
over again.

At any point during the release cycle PATCH version increments can be tagged
to fix bugs, especially safety hazards or security vulnerabilities.


Release Manager
---------------

For each release cycle one of the repo's maintainers (ideally always the same),
should be elected the release manager, which will be responsible for:

* deciding when the stabilization stage begins and ends;
* coordenating other maintainers during the stabilization phase;
* tagging and pushing the version to the repo;


Submodule Management
---------------------

Upon a release tagging, each submodule in the repo should be pointing to a
specific release of the submodule's repo. This may require that a repository's
release cycle to be somewhat synchronized to the release cycle of its submodule
dependencies.

CI support
----------

.. TODO