Skip to content

Commit

Permalink
Updated DEC link
Browse files Browse the repository at this point in the history
  • Loading branch information
richgarner71 committed Mar 31, 2023
1 parent 0413c40 commit f724b2e
Show file tree
Hide file tree
Showing 2 changed files with 1 addition and 1 deletion.
File renamed without changes.
2 changes: 1 addition & 1 deletion _includes/sbir.html
Original file line number Diff line number Diff line change
Expand Up @@ -46,7 +46,7 @@ <h1>Small Business Innovation Research (SBIR)/Small Business Technology Transfer
<li><b>Signed IA Part B</b><br>
Please see the <a href="https://docs.google.com/document/d/1_ThwFcXaCHFo3oJI2n_MmTiZcgib4cmfXFxRHTvJmlo/edit" onClick="return confirm('This link will open a Google document.')" class="external" target="_new">AAS 7600B Client Quick Reference Guide</a> for information that the requesting agency organization must provide.
</li>
<li><b><a href="https://docs.google.com/document/d/1ZKDweXx04HVYhZhB5V-bAxHSLHX6IQ_S3_dRNSSgcmM/edit" onClick="return confirm('This link will open a Google document.')" class="external" target="_new">DEC Statement</a></b><br>
<li><b><a href="../DEC_Statement_Contracts.pdf" target="_new">DEC Statement</a></b><br>
This is a document in which the client technical expert will work with the assigned GSA POC to document how the work to be performed on the Phase III contract derives from, extends or completes (DEC) prior SBIR efforts. The GSA PM will assist with the form to some extent, but the client must provide the narrative and lineage to prior Phase I/II/III efforts.
</li>
<li><b>Unique Documentation if the Phase III awardee is not the original Phase I/II awardee</b><br>
Expand Down

0 comments on commit f724b2e

Please sign in to comment.