Skip to content

chore(deps): bump golang.org/x/crypto from 0.17.0 to 0.31.0 #122

chore(deps): bump golang.org/x/crypto from 0.17.0 to 0.31.0

chore(deps): bump golang.org/x/crypto from 0.17.0 to 0.31.0 #122

Triggered via pull request December 11, 2024 23:34
Status Failure
Total duration 20m 49s
Artifacts

test.yaml

on: pull_request
Integration Test
11m 39s
Integration Test
K8s Integration Test
22s
K8s Integration Test
Module Integration Test
8m 57s
Module Integration Test
VM Integration Test
19s
VM Integration Test
Matrix: Build Test
Matrix: Test
Fit to window
Zoom out
Zoom in

Annotations

8 errors and 3 warnings
Build Test (ubuntu-latest)
Process completed with exit code 1.
VM Integration Test
Process completed with exit code 1.
Build Test (macos-latest)
The job was canceled because "ubuntu-latest" failed.
Build Test (macos-latest)
The operation was canceled.
Build Test (windows-latest)
The job was canceled because "ubuntu-latest" failed.
Build Test (windows-latest)
The operation was canceled.
K8s Integration Test
Process completed with exit code 1.
Integration Test
Process completed with exit code 1.
Module Integration Test
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Integration Test
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636
Test (ubuntu-latest)
ubuntu-latest pipelines will use ubuntu-24.04 soon. For more details, see https://github.com/actions/runner-images/issues/10636