-
Notifications
You must be signed in to change notification settings - Fork 268
Commit
This commit does not belong to any branch on this repository, and may belong to a fork outside of the repository.
* docs: Rewrite article article about assembling clever 4 * docs: Update * docs: Update clever 4 assemble * docs: remove old assembly instructions images * docs: Renamed and returned assembly instruction about clover 4.0, some fixes * docs: Add english version of the article, some fixes * docs: resize assemble images * docs: fix assets check errors * docs: fix image size error
- Loading branch information
Showing
134 changed files
with
609 additions
and
153 deletions.
There are no files selected for viewing
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
File renamed without changes
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
Oops, something went wrong.
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Large diffs are not rendered by default.
Oops, something went wrong.
Empty file.
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Original file line number | Diff line number | Diff line change |
---|---|---|
@@ -0,0 +1,225 @@ | ||
# Clover 4 assembly | ||
|
||
## Fasteners size | ||
|
||
> **Hint** During assembly, screws and racks of various sizes are used, using fasteners of the wrong size can damage the copter. | ||
<img src="../assets/assembling_clever4_2/mounts_size_en.png" width=500 class="zoom border"> | ||
|
||
## Frame Assembly | ||
|
||
1. Align the 4 beams with the center deck, fix them with the M3x8 screws and nuts with a nylon insert. | ||
|
||
<div class="image-group"> | ||
<img src="../assets/assembling_clever4_2/frame_1.png" width=300 class="zoom border"> | ||
<img src="../assets/assembling_clever4_2/frame_2.png" width=300 class="zoom border"> | ||
</div> | ||
|
||
2. Install 2 20mm posts on the center holes in the main deck and fix them with the M3x8 screws. | ||
|
||
<img src="../assets/assembling_clever4_2/frame_3.png" width=300 class="zoom border center"> | ||
|
||
3. Install the stiffener hook into the groove in the beam. | ||
|
||
<img src="../assets/assembling_clever4_2/frame_4.png" width=300 class="zoom border center"> | ||
|
||
4. Press the stiffeners onto the main deck. | ||
|
||
<img src="../assets/assembling_clever4_2/frame_5.png" width=300 class="zoom border center"> | ||
|
||
5. Tighten the stiffeners with a small carbon deck. | ||
|
||
<img src="../assets/assembling_clever4_2/frame_6.png" width=300 class="zoom border center"> | ||
|
||
6. Install 4 6mm nylon posts and fix them with the M3x6 screws. | ||
|
||
<img src="../assets/assembling_clever4_2/frame_7.png" width=300 class="zoom border center"> | ||
|
||
## Installating motors | ||
|
||
1. When installing motors, pay attention to the rotation scheme of the motors. The rotation marking on the motors must match the rotation pattern. | ||
|
||
<img id="prop_rotation" src="../assets/assembling_clever4_0/props_rotation.png" width=300 class="zoom border center"> | ||
|
||
2. Mount the motor on the corresponding holes in the beam using **M3x5 screws**. | ||
|
||
<div class="image-group"> | ||
<img src="../assets/assembling_clever4_2/motor_1.png" width=300 class="zoom border"> | ||
<img src="../assets/assembling_clever4_2/motor_2.png" width=300 class="zoom border"> | ||
</div> | ||
|
||
> **Caution** Make sure that the motors are secured with M3x5 screws, otherwise a short circuit between the windings may occur. | ||
## Installing ESC and PDB | ||
|
||
1. Connect the speed controllers (ESC) to the motors using the MR30 connectors and fasten them to the beams using clamps. | ||
|
||
<div class="image-group"> | ||
<img src="../assets/assembling_clever4_2/esc_1.png" width=300 class="zoom border"> | ||
<img src="../assets/assembling_clever4_2/esc_2.png" width=300 class="zoom border"> | ||
</div> | ||
|
||
2. Install the power distribution board (PDB) on the pre-mounted racks and secure it with 6mm racks. The power distribution board must be installed so that the power connection cable points toward the tail of the aircraft. | ||
|
||
<img src="../assets/assembling_clever4_2/pdb_1.png" width=300 class="zoom border center"> | ||
|
||
3. Connect the power outputs of the speed controllers to the power distribution board. | ||
|
||
<img src="../assets/assembling_clever4_2/pdb_2.png" width=300 class="zoom border center"> | ||
|
||
## Installing Flight Controller | ||
|
||
Set *Clover 4* allows you to install various flight controllers, for example *COEX Pix* and *Pixracer*. | ||
|
||
> **Caution** During installation the flight controller, pay attention to the arrow located on the board, it should be directed to the copter bow. | ||
### COEX Pix | ||
|
||
> **Hint** Before installing the damper struts, screw 2 layers of nylon nuts, for a stronger fix or bite off the excess thread using side cutters. | ||
Install the damper struts, fix *COEX Pix* on them with nylon nuts. | ||
|
||
<img src="../assets/assembling_clever4_2/coex_pix.png" width=300 class="zoom border center"> | ||
|
||
### Pixracer | ||
|
||
1. Place the small deck on the racks and secure it with nylon nuts. | ||
|
||
<img src="../assets/assembling_clever4_2/pixracer_1.png" width=300 class="zoom border center"> | ||
|
||
2. Glue 3-4 layers of double-sided tape, glue it in the center of the small deck and install *Pixracer* on top. | ||
|
||
<img src="../assets/assembling_clever4_2/pixracer_2.png" width=300 class="zoom border center"> | ||
|
||
## Connect Flight Controller | ||
|
||
1. Connect the speed controllers to the flight controller in accordance with the diagram. | ||
|
||
<img src="../assets/assembling_clever4_2/fc_connection_1.png" width=300 class="zoom border center"> | ||
|
||
2. Connect the power cable to the power distribution board(PDB) and the corresponding connector on the flight controller. | ||
|
||
<img src="../assets/assembling_clever4_2/fc_connection_2.png" width=300 class="zoom border center"> | ||
|
||
3. Install 40mm aluminum racks on the M3x12 screws. | ||
|
||
<div class="image-group"> | ||
<img src="../assets/assembling_clever4_2/fc_connection_3.png" width=300 class="zoom border"> | ||
<img src="../assets/assembling_clever4_2/fc_connection_4.png" width=300 class="zoom border"> | ||
</div> | ||
|
||
## Installing Raspberry Pi | ||
|
||
1. Install the 20mm racks on the main deck, fix them with the M3x8 screws. | ||
|
||
<div class="image-group"> | ||
<img src="../assets/assembling_clever4_2/fc_connection_5.png" width=300 class="zoom border"> | ||
<img src="../assets/assembling_clever4_2/fc_connection_6.png" width=300 class="zoom border"> | ||
</div> | ||
|
||
2. On a mounting deck, install 6mm racks and 30mm racks, fasten them with the M3x6 and M3x12 bolts, respectively. | ||
|
||
<img src="../assets/assembling_clever4_2/raspberry_1.png" width=300 class="zoom border center"> | ||
|
||
3. Install the assembled mounting deck on the main deck and fix with the M3x8 screws. | ||
|
||
<img src="../assets/assembling_clever4_2/raspberry_2.png" width=300 class="zoom border center"> | ||
|
||
4. Install the *Raspberry Pi* circuit board and fix with nylon nuts. | ||
|
||
<img src="../assets/assembling_clever4_2/raspberry_3.png" width=300 class="zoom border center"> | ||
|
||
5. On the capture deck, install the rangefinder using self-locking nuts and M3x8 screws, and glue the radio using double-sided tape. | ||
|
||
<img src="../assets/assembling_clever4_2/raspberry_5.png" width=300 class="zoom border center"> | ||
|
||
6. Install 4 20mm racks and fix them with the M3x8 screws. | ||
|
||
<img src="../assets/assembling_clever4_2/raspberry_6.png" width=300 class="zoom border center"> | ||
|
||
7. Install the camera on the small mounting deck and fix it with 2 M2x5 self-tapping screws in the upper left and lower right corners. | ||
|
||
<img src="../assets/assembling_clever4_2/raspberry_7.png" width=300 class="zoom border center"> | ||
|
||
8. Install the camera module on the capture deck and fix with the M3x8 screws. | ||
|
||
<img src="../assets/assembling_clever4_2/raspberry_8.png" width=300 class="zoom border center"> | ||
|
||
9. Install the assembled pickup deck and fix with the M3x8 screws. | ||
|
||
<img src="../assets/assembling_clever4_2/raspberry_9.png" width=300 class="zoom border center"> | ||
|
||
10. Connect to the *Raspberry Pi* rangefinder and power cable. | ||
|
||
<img src="../assets/assembling_clever4_2/raspberry_10.png" width=300 class="zoom border center"> | ||
|
||
11. Connect the camera cable to *Raspberry Pi*. | ||
|
||
<img src="../assets/assembling_clever4_2/raspberry_11.png" width=300 class="zoom border center"> | ||
|
||
## Installing LED strip | ||
|
||
1. Assemble the hoop for the LED strip by combining the lock on the ends. | ||
|
||
<img src="../assets/assembling_clever4_2/led_1.png" width=300 class="zoom border center"> | ||
|
||
2. Stick the LED strip on the hoop, for better fastening, pull it with 3-4 clamps. | ||
|
||
<img src="../assets/assembling_clever4_2/led_2.png" width=300 class="zoom border center"> | ||
|
||
3. Install the legs on the stiffening plate using self-locking nuts and M3x8 screws using only the extreme mounting holes. From below, between the plates of the legs, install a damper silicone ring. | ||
|
||
<img src="../assets/assembling_clever4_2/led_3.png" width=300 class="zoom border center"> | ||
|
||
4. Bend the legs back and install a hoop with LED strip in a special groove on them so that the connection cables exit from the tail side of the copter. | ||
|
||
<img src="../assets/assembling_clever4_2/led_4.png" width=300 class="zoom border center"> | ||
|
||
5. Behind fasten the legs with self-locking nuts and M3x8 screws. | ||
|
||
<img src="../assets/assembling_clever4_2/led_5.png" width=300 class="zoom border center"> | ||
|
||
6. Connect the LED strip power (red, black cables) to the short JST connector on the PDB. | ||
|
||
<img src="../assets/assembling_clever4_2/led_5.png" width=300 class="zoom border center"> | ||
|
||
7. Connect the signal output of the LED strip (white cable) to *Raspberry Ri*, to pin *GPIO 21*. | ||
|
||
<img src="../assets/assembling_clever4_2/led_6.png" width=300 class="zoom border center"> | ||
|
||
## Installing guard | ||
|
||
1. Assemble the lower level of guard with 40mm racks and M3x12 screws. | ||
|
||
<img src="../assets/assembling_clever4_2/guard_1.png" width=300 class="zoom border center"> | ||
|
||
2. Assemble the top level of protection with the M3x12 screws. | ||
|
||
<img src="../assets/assembling_clever4_2/guard_2.png" width=300 class="zoom border center"> | ||
|
||
3. Install the mounting deck and fix it with M3x8 bolts. | ||
|
||
<img src="../assets/assembling_clever4_2/guard_3.png" width=300 class="zoom border center"> | ||
|
||
4. Establish protection and fix on beams by means of self-locking nuts and M3x8 screws. | ||
|
||
<img src="../assets/assembling_clever4_2/guard_4.png" width=300 class="zoom border center"> | ||
|
||
## Flight preparation | ||
|
||
1. Install the battery strap and connect the flight controller to the *Raspberry Pi* using a USB cable. | ||
|
||
<div class="image-group"> | ||
<img src="../assets/assembling_clever4_2/final_1.png" width=300 class="zoom border"> | ||
<img src="../assets/assembling_clever4_2/final_2.png" width=300 class="zoom border"> | ||
</div> | ||
|
||
2. Install the propellers in accordance with the [directional diagram of the motors](#prop_rotation). | ||
|
||
<img src="../assets/assembling_clever4_2/final_3.png" width=300 class="zoom border center"> | ||
|
||
3. Install the battery. | ||
|
||
<img src="../assets/assembling_clever4_2/final_4.png" width=300 class="zoom border center"> | ||
|
||
> **Success** The drone is assembled, then make ["setup"](setup.md). |
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
This file contains bidirectional Unicode text that may be interpreted or compiled differently than what appears below. To review, open the file in an editor that reveals hidden Unicode characters.
Learn more about bidirectional Unicode characters
Oops, something went wrong.