Nightly pipeline normal session e2e tests #161
This run and associated checks have been archived and are scheduled for deletion.
Learn more about checks retention
nightly-normal-session-e2e-tests.yml
on: schedule
Check vars and secrets
/
Check available vars and secrets
0s
Build production node and runtime artifacts (PR version)
/
Build production node and runtime
6m 27s
Build production node and e2e client docker image
/
Build production node docker image
Build production node and e2e client docker image
/
Build e2e client image
Build production node and e2e client docker image
/
Build synthetic-network image
Run high out-latency test
0s
Sync test using synthetic-network - one node catching up and then becoming necessary for consensus
0s
Sync test using synthetic-network - one node catching up
0s
Sync test using synthetic-network - into two groups and one quorum and switch quorum between them
0s
Sync test using synthetic-network - into multiple groups of two
0s
Sync test using synthetic-network - into two equal size groups with no quorum
0s
Sync test using synthetic-network - into two groups one with quorum
0s
Run high out-latency for every quorum
0s
Slack notification
10s
Annotations
3 errors
Build production node and runtime artifacts (PR version) / Build production node and runtime
The runner has received a shutdown signal. This can happen when the runner service is stopped, or a manually started runner is canceled.
|
Build production node and runtime artifacts (PR version) / Build production node and runtime
The operation was canceled.
|
Check nightly test suite completion
Process completed with exit code 1.
|