Re: Toby's post-construction plans: action to review and record of storage at #1529. Ticket includes David Voneshen feedback noted previously in the last sprint review ticket.
Tutorial validation: validate horace using Horace training course #1314 start 2.1.24 latest, end 18.1.24. Plus any tickets arising. At 8.1.24 20% complete.
(based on Alex local copy, check if current given multifit comments, check Sharepoint, circulate, cm to create sharepoint folder, by 10.1.24) DONE
Spherical projection - done bar docs, Christian concerns - Christian has docs and example - ALEX to discuss with Duc on whether this meets user needs, soon (based on Christian's uncertainties, get representative dataset) - image of what Christian wants and what Christian got (+rb-no. if available)
Fan IDAAAS problem - Alex to contact Fan re has she run script, what results
Cylindrical projections (5d) after spherical and IDAAAS performance
Horace help issue needs ticketing to continue having Fan work on this
Spherical projection with Tobyfit (a) plot ellipsoid (b) resconv (needs 2 tickets) current resolution convolution and resolution plots are consistent with ortho_proj only #1040 23.1.24 to 23.2.24 (latest, could be 15.1.24) depending on scoping exercise TOBY - working, docs only, by 26.1.24 ALEX (DUC?) TO DISCUSS 8.1.24 do first to inform scope of next 2: post-construction
JACOB
Tobyfit memory: Running out of memory on resolution calc for large npix #760 in progress, by 8.1.24 PR await submission, nb still not filebacked, may need pageop implementation for 4-way zip plus extra optimisations. Ensure this solves Duc's issue. PR awaits approval
Profiling: EPIC: Benchmarking PACE #676 BACKGROUND ONGOING 2.1.24-2.2.24 have fake data, need real data, want known time-hoggers JACOB TOBY TO DISCUSS w/c 15.1.24 (profilng, parallelization) - JW plan emailed and in ticket - finish Feb w1
Fix CI, need ticket, SL7 nodes retiring. (2d) Add additional Matlab versions to new R8 nodes.
Review documentation changes (how do we do this?) still need to ask Excitations/David eg at Excitations awayday
email from Boothroyd post-doc - need to investigate their problems
pace-builder a/c needs 2fa - sort within week
JW notes: 17/1/24
David harangued will schedule and arrange documentation review within Excitations. Plan akin to example script development assigning sections to individuals.
Viviane's (Boothroyd's post-doc) IDAaaS workspace expired over New Year's break email sent requesting new one
CI pipelines set up and "working" but lacking cppcheck, email sent to Alan Kyffin. Followup when time has passed to chase.
Update 18/1/24:
Alan has installed more MATLAB versions and newest cppcheck
Talk to Duc about info in nxspe; DUC/TOBY Chase Mantid team detector info (script failing): Duc says Merlin and Maps raw files have info - Toby to browse hdf5 output - need to get this into nxspe, raise Mantid epic - Toby and Jacob talk to Duc
Toby ticket hashing issues, yes, Chris to add.
troubleshoot, ongoing, background
run challenging cases (generate them) with H4 e.g. cut-sym
Radu Epic - TGP review and comment on JW tickets - this sprint
Still uncovered
prioritizing:
bugs (alex, end w/c 5/2/24) (jacob #1525 quick, #1524 lo-pr, #1519 longer, characterise for Duc, #1510 fixed) (joint #1505 to alex)
docs
spherical, cylindrical
(infrastructure working)
jacob profiling is at data assembly stage
profiling - slowdown due to IDAAAS issues, but same as 3.6.3
push on idaaas behaviour incl Toby
nb slurm setup may have multiple caches
use toby timing script
New issues since last sprint review 23.1.24
dnd
fromsqw
results insqw
#1525sqw
from array seems to fail #1524NB H4UX epic is at
New at last sprint review 23.1.24
Re: Toby's post-construction plans: action to review and record of storage at #1529. Ticket includes David Voneshen feedback noted previously in the last sprint review ticket.
From ALEX:
[a,b,c]=plot(1DObject)
does not return correct c #1501head
form generates very obscure error message on windows #1493change_crystal_horace
is outdated #1491cut_dnd
with projection and verify the robustness of the interpolation #1481From JACOB
From TOBY:
From last time:
(a) Major items in progress or planned
ALEX:
(based on Alex local copy, check if current given multifit comments, check Sharepoint, circulate, cm to create sharepoint folder, by 10.1.24) DONE
JACOB
parallel_call
failing on Jenkins for cut #1172 JENKINS ONLY -JW notes: 17/1/24
cppcheck
, email sent to Alan Kyffin. Followup when time has passed to chase.Update 18/1/24:
CHRIS
Detector tickets
Container tickets
TOBY
(b) Suggestions for next areas to do
(c) New issues prioritised up to 28.11.23
Filebacked
Performance
Tobyfit/Detectors
Parallel
Tests
No open tickets
Filebacked epic #1302
(e) Previous issues still outstanding
Think these are largely dealt with above
See previous sprint review 12.12.23 for details when the main issues are cleared