8inch Challenge Solution

This document explains the solution to the 8inch challenge presented in the 8Inch.sol contract.

The Vulnerability

The main vulnerability in this challenge lies in the SafeUint112.sol contract, specifically in the safeCast and safeMul functions. These functions are intended to prevent overflows when working with uint112, but they have a critical flaw.

The Issue

  1. In safeCast, the check value <= (1 << 112) is incorrect. It should be value < (1 << 112) because (1 << 112) is actually 2^112, which is the first value that doesn't fit in a uint112.

  2. In safeMul, the same issue exists with the check uint256(a) * b <= (1 << 112).

These flaws allow for potential overflows when casting or multiplying, which can be exploited.

The Exploit

The solution exploits this vulnerability in the following ways:

  1. It first settles the initial trade multiple times, taking advantage of the rounding errors to drain more tokens than intended.

  2. It then creates a new trade with a very large scale factor.

  3. The scaleTrade function is called with this large scale factor, causing an overflow in the safeMul function.

  4. This overflow results in a trade with an extremely favorable rate for the attacker.

  5. The attacker then settles this trade, acquiring a large number of WOJAK tokens.

Implementation Details

The key steps in the Solution.s.sol script are:

  1. Settle the initial trade multiple times to drain extra tokens.
  2. Create a new dummy token with a large supply.
  3. Create a new trade with a small amount of WOJAK for the dummy token.
  4. Scale this trade with an extremely large factor: 2596148429267413814265248164610033.
  5. Settle the scaled trade, acquiring all the WOJAK tokens in the contract.
  6. Transfer the required amount of WOJAK tokens to the specified address to solve the challenge.