You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Knowing the elevation of the crown of the road at the crossing, project that elevation upstream and create the lake/bathtub/reservoir--the area that would fill before it would spill over the roadway.
Figure out the volume of that area--the upstream max storage volume.
Compare that volume to capacity, and determine if that volume would translate to a rate that would exceed the capacity (which is also a rate)
More to come.
The text was updated successfully, but these errors were encountered:
(Some notes)
More to come.
The text was updated successfully, but these errors were encountered: