-
Notifications
You must be signed in to change notification settings - Fork 4
/
Copy path1_Lead.tex
179 lines (158 loc) · 8.68 KB
/
1_Lead.tex
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81
82
83
84
85
86
87
88
89
90
91
92
93
94
95
96
97
98
99
100
101
102
103
104
105
106
107
108
109
110
111
112
113
114
115
116
117
118
119
120
121
122
123
124
125
126
127
128
129
130
131
132
133
134
135
136
137
138
139
140
141
142
143
144
145
146
147
148
149
150
151
152
153
154
155
156
157
158
159
160
161
162
163
164
165
166
167
168
169
170
171
172
173
174
175
176
177
178
179
\newpage
\setcounter{page}{1}
\lhead{Lead}
\lfoot{\thepage / \pageref{end_section_lead}}
\section*{Lead}
\input{0_NoteMissionControl}
\input{0_Legend}
\begin{enumerate}[label=L\arabic*.]
\item READ THE WHOLE CHECKLIST BEFORE STARTING \checkbox
\starttask{Required tools, materials and personnel}{\hphantom{a}}
\item \label{lead_personnel} Personnel
\begin{enumerate}[label*=\arabic*.]
\item Mission Lead: Georg Mikula
\end{enumerate}
\item \label{lead_tools} Tools
\begin{enumerate}[label*=\arabic*.]
\item Pen\checkbox
\end{enumerate}
\starttask{Pre-Launch Prep}{\hphantom{a}}
\item Instruct Pad Prep personnel to start with Pad Prep checklist. (\ref{pad_prep_start}-\ref{pad_prep_end})\checkbox
\item Instruct Rocket prep personnel to start non-energetic rocket assembly (\ref{rocket_non_energetic_start}-\ref{rocket_non_energetic_end}).\checkbox
\starttask{Launch Day}{\hphantom{a}}
\item Request igniter preparation(\ref{rocket_prep_igniters_start}-\ref{rocket_prep_igniters_end}).\checkbox
\item Instruct Pad prep personnel to start with Pad prep checklist (\ref{pad_prep_start}-\ref{pad_prep_end}) if not already done, otherwise instruct Pad personnel to start On-Day pad prep checklist (\ref{pad_on_day_elec_start}-\ref{pad_on_day_elec_end}).\checkbox
\item Request Mission Control Area Clearance from EuRoC staff, if clearance is given, instruct MC preps (\ref{mc_prep_start}-\ref{mc_prep_end}).\checkbox
\item Wait for non-energetic rocket assembly completion (\ref{rocket_non_energetic_end}.\checkbox
\item Request energetics rocket assembly clearance from EuRoC staff.\checkbox
\item Instruct energetics rocket assembly (\ref{rocket_energetic_start}-\ref{rocket_energetic_end}).\checkbox
\item Wait for pad prep completion (\ref{pad_prep_end}).\checkbox
\item Wait for energetics rocket assembly(\ref{rocket_energetic_end}).\checkbox
\item Request LRR.\checkbox
\item PASS LRR.\checkbox
\item If MC clearance wasn't given before, request clearance from EuRoC staff and if given, instruct MC preps (\ref{mc_prep_start}-\ref{mc_prep_end}).\checkbox
\item Wait for On-Day electronics check to be completed (\ref{pad_on_day_elec_end}).\checkbox
\item Request clearance for final rocket assembly from EuRoC staff.\checkbox
\item Request final rocket assembly (\ref{rocket_final_start}-\ref{rocket_final_end}).\checkbox
\item Request rocket mounting from Pad personnel (\ref{pad_rocket_mounting_start}-\ref{pad_rocket_mounting_end}).\checkbox
\item Request Fueling from pad personnel (\ref{pad_fueling_start}-\ref{pad_fueling_end}).\checkbox
\textcolor{gray}{\begin{itemize}
\item Wait for fueling request from Lead.\leftcheckbox
\item Verify fuel main valve is closed.\leftcheckbox
\item Fill fueling syringe with \SI{950}{\milli\liter} ethanol\leftcheckbox
\item Fuel \SI{900}{\milli\liter} \leftcheckbox
\item Clean up spills\leftcheckbox
\item Mount fincan to rocket\leftcheckbox
\item Secure fincan with 8 screws\leftcheckbox
\item Remove cover from oxidizer loading port\leftcheckbox
\item Connect Ox umbilical\leftcheckbox
\item Verify Ox umbilical mechanical connection (pull umbilical), reconnect if loose\leftcheckbox
\item Report that fueling is completed to Mission Lead.\leftcheckbox
\end{itemize}}
\item \underline{Clear Flash}\checkbox
\newpage
\starttask{Oxidizer Filling}{\hphantom{a}}
\item Verify ox tanking closed\checkbox
\item Verify ox vent open\checkbox
\item Verify pressurant tanking closed\checkbox
\item Verify pressurant vent open\checkbox
\item Cycle Holddown servo (open, then close)\checkbox
\item Preliminary internal Go/NoGo Poll\checkbox
\begin{enumerate}[label*=\arabic*.]
\item Pad \leftcheckbox
\item Mission Control \leftcheckbox
\end{enumerate}
\item Wait for Launch Window imminent (\SI{30}{\minute})\checkbox
\item Internal Go/NoGo Poll\checkbox
\begin{enumerate}[label*=\arabic*.]
\item Pad \leftcheckbox
\item Mission Control \leftcheckbox
\end{enumerate}
\item Request Final Preps from pad personnel (\ref{pad_final_preps_start}-\ref{vacate_pad}).\checkbox
\textcolor{gray}{\begin{itemize}
\item Wait for Mission Lead to request Final Preps\leftcheckbox
\item Unfold emergency umbilical release line and extend line away from pad \leftcheckbox
\item Clean intake filters for water pumps \leftcheckbox
\item Put on safety glasses, gloves, hearing protection and long sleeved shirt and trousers.\leftcheckbox
\item Verify holddown closed\leftcheckbox
\item Start pad cams\leftcheckbox
\item Request Pressurization clearance from EuRoC LCO\leftcheckbox
\item Raise red pendant\leftcheckbox
\item Open Ox bottle\leftcheckbox
\item Open Pressurant bottle\leftcheckbox
\item Read out pressurant bottle pressure and forward to\newline Mission Lead.\leftcheckbox
\item Start flight on TRS\leftcheckbox
\item Remove RBF zip tie \leftcheckbox
\item Remove RBF umbilical locking device \leftcheckbox
\item Pull RBF pin\leftcheckbox
\item Report Final preps complete to Mission Lead.\leftcheckbox
\item Vacate pad\leftcheckbox
\end{itemize}}
% \item Check igniters deactivated\checkbox
% \item Install igniters \checkbox
% \begin{itemize}
% \item Use fresh PTFE seal\leftcheckbox
% \item E-match side up\leftcheckbox
% \item Note which igniter (0/1/2/…) installed where (A/B)\leftcheckbox
% \item Fully tighten screws\leftcheckbox
% \item Cable manage igniters with cable tie or aluminium tape\leftcheckbox
% \end{itemize}
\item \underline{Verify igniter continuity. Igniter indicators should be yellow in ECUI} \checkbox
\item Verify ox main closed\checkbox
\item Set Supercharge 30bar, Hysteresis 1bar\checkbox
\item Enable Supercharge pressure control\checkbox
\item Close pressurant vent\checkbox
\item Pre-Pressurize tanks\checkbox
\begin{enumerate}[label*=\arabic*.]
\item Open pressurant tanking \leftcheckbox
\item After supercharge opens, close pressurant tanking immediately \leftcheckbox
\end{enumerate}
\item Close ox vent\checkbox
\item Open ox tanking over a duration of \SI{10}{\second}\checkbox
\item Activate heating cycle\checkbox
\item After first plume, close ox tanking immediately\checkbox
\item Activate cooling cycle\checkbox
\item \label{ox_top_off} Top off Oxidizer
\begin{enumerate}[label*=\arabic*.]
\item Wait for stable vent frequency \leftcheckbox
\item Open ox tanking over a duration of \SI{10}{\second} \leftcheckbox
\item After first plume, close ox tanking immediately \leftcheckbox
\end{enumerate}
\item In case of Hold or Delay of launch window, repeat \ref{ox_top_off} until final GO.
\item Open Ox vent\checkbox
\item Wait for Launch Window\checkbox
% \item Enable internal cameras \checkbox
\item Set Supercharge 60bar, Hysteresis 1bar\checkbox
\item Open pressurant tanking\checkbox
\item Wait for stable pressures\checkbox
\item Close pressurant tanking\checkbox
\item Open pressurant vent \checkbox
\starttask{Launch}{\hphantom{a}}
\item Go/NoGo for launch from EuRoC staff\newline (TRS camera points to receiver)\checkbox
\item Activate umbilical retract\checkbox
\item Verify clean separation visually (network camera)\checkbox
%\item Deactivate charging.\checkbox
\item Launch\checkbox
\newpage
\starttask{Safe GSE}{\hphantom{a}}
\item \label{lead_gse_safing} Request GSE Safing from Pad crew (\ref{pad_gse_safing_start}-\ref{pad_gse_safing_end}).\checkbox
\item Open ox tanking\checkbox
\item Open pressurant tanking\checkbox
\item Verify all pressures are ambient\checkbox
\item Announce "safe state"\checkbox
\item Stop network cameras\checkbox
\item Stop pad cameras\checkbox
\starttask{Safe GSE and Rocket after Abort}{\hphantom{a}}
Rocket is fully pressurized
\item Open supercharge\checkbox
\item Close supercharge after pressure in tank is ambient\checkbox
\item Open fuel main OR Wait for fuel bleed to vent\checkbox
\item Go to \ref{lead_gse_safing} \checkbox
% \starttask{Recycle after Abort}{\hphantom{a}}
% \item \checkbox
% \item \checkbox
% \item \checkbox
% \item \checkbox
% \item \checkbox
\label{end_section_lead}
\end{enumerate}