You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Picking up the task of hardware-based analog assignments along with @Premraj02. Starting with the week 1 assignment, the measuring instruments (Multimeter, Oscilloscope) and soldering stuff will be brought together. @ChinmayLonkar will be looking with PCB designing. We'll upload the planned analog assignments soon.
Post the week-wise schedule here. Also, @Sidshx when/in which week do you propose to include the previous content from week 1 viz. Switch Debouncing, Push Pull, and, Flip flops, Latches.
As discussed, basic concepts are to be added from the following sections
Todo -
CC - @ChinmayLonkar @Premraj02, you may also include other TYs
The text was updated successfully, but these errors were encountered: