You signed in with another tab or window. Reload to refresh your session.You signed out in another tab or window. Reload to refresh your session.You switched accounts on another tab or window. Reload to refresh your session.Dismiss alert
Distance project to combine several strata into a single stratum. Created new field in stratum layer upon which to perform post-stratification.
e.g.
Strat1 (area 720) merged with Strat2 (area 372) merged with Strat3 (area 736). When abundance is calculated, the area of Strat1 is used, rather than the combined area of 3 strata.
This is a problem when post-stratifying, but of course, not when doing a 'normal stratification.'
The text was updated successfully, but these errors were encountered:
Distance project to combine several strata into a single stratum. Created new field in stratum layer upon which to perform post-stratification.
e.g.
Strat1 (area 720) merged with Strat2 (area 372) merged with Strat3 (area 736). When abundance is calculated, the area of Strat1 is used, rather than the combined area of 3 strata.
This is a problem when post-stratifying, but of course, not when doing a 'normal stratification.'
The text was updated successfully, but these errors were encountered: