Skip to content

Latest commit

 

History

History
42 lines (27 loc) · 2.99 KB

builder-proposal-example.md

File metadata and controls

42 lines (27 loc) · 2.99 KB

Frontinus House Builder Proposal

A standard of how a Frontinus House Builder Proposal should be submitted. Please follow each Proposal to Frontinus house in a similar fashion. Amendments are required in sections highlighted boldly.

Briq Builders - Eiffel Tower of Briqs

Introduction

Name or social handle of proposer: [Kevin]

Ethereum Mainnet Address: [0x654f8C82217d4a5d0Ad37B4D8bf1130Dfdf52eb9]

ENS name (optional): [Kevin.eth]

Twitter handle (optional): [@Kevin]

Any relevant links/Websites (optional): Kevin.com

Introduction video link (optional): https://www.youtube.com/watch?v=ExltDReEdno

Project Detail

I would like to propose the Briq Biblio Eiffel tower. The Briq Builders team will by had build the Eiffel tower with Briqs, the brand of Bibliotheca DAO will be front and centre throughout this build. I believe this will give great exposure of Bibliotheca DAO and the further ecosystem to all of France and bring in a huge wave of builders within the Bibliotha DAO ecosystem.

A Briq development of this scale is yet to of been accomplished but coordinating with the DAO and with the further Starknet ecosystem I believe we could produce a world first.

I am invigorated to accomplish a world first in collaboration with the greatest DAO within the Ethereum ecosystem.

Character

I am Kevin the lead Brriq designer within the Briq Builders. The Briq Builders are a consortium of builders tied to one another with a love of all thing brick based. We originally built houses in the south of France but have came together to a full Briq based team.

We have past experience in Briq constructions creating such monoliths such as Stormtrooper, The "M" and Minimal Pepe.

Timeline

This will be a 6 month build collaborating with the greatest of Briq builders in the world. I estimate a start date of 10/08/2023 and end date of 10/08/2023 although this is an approximation and the may be up to 1-2 month variance.

Objectives

Objective Contributor Estimated deadline
Buy Briq Kevin 10/08/23
Plan the Tower Kevin & Dave 10/09/23
Complete construction Kevin, Dave & co TBD

Grant Request

The will be cost a great amout of time expecting up to 1000 hours of construction work an approximate cost of 100,000 Briqs at a market rate of .38c per Briq. We expect a total cost of 60,000 USDC.